Our Sanitary Services

Complete Plumbing Solutions

From bathroom fit-outs to industrial pipe systems — installations coordinated with your site schedule and other trades.

Bathroom Installations

Complete bathroom fit-outs — from layout and fixture selection to installation and finishing coordination.

  • Full renovations
  • Fixture installation
  • Accessibility adaptations
  • Layout coordination

Pipe Systems

Water supply and drainage routing — planned around your building layout and coordinated with other trades.

  • Water supply lines
  • Drainage systems
  • Pipe renovations
  • Leak detection & repair

Hot Water Systems

Domestic hot water solutions sized for the building and coordinated with heating infrastructure.

  • Boiler installations
  • Solar thermal
  • Heat pump integration
  • Storage systems

Maintenance & Repair

Scheduled maintenance and repair services to keep sanitary systems running reliably.

  • Preventive maintenance
  • Repair services
  • System inspections
  • Upgrades
Practical Guidance

What Matters Before Sanitary Works Start

Sanitary installations depend on layout, routing, technical coordination, fixture choices, and installation constraints. Early decisions directly affect execution, timing, and budget clarity. A project-specific review is often needed before confirming scope or planning.

  • Layout and fixture positions affect pipe routing and technical shaft access
  • Drainage slopes and connection points need to be confirmed before finishing work begins
  • Product changes during execution can affect dimensions, connections, and planning
  • Coordination with HVAC, electrical, and finishing trades avoids rework and delays
Before You Start

Typical Points to Clarify Early

Fixture selection & dimensions

Confirm models, sizes, and mounting requirements before routing is fixed.

Water supply & drainage routing

Identify connection points, pipe runs, and slope requirements early.

Access & technical space

Check shaft dimensions, ceiling voids, and floor build-up for pipe routing.

Wall & floor finish coordination

Align tiling, waterproofing, and fixture recessing with finishing trades.

Timing relative to other trades

Plan rough-in, finishing, and testing phases around HVAC, electrical, and general works.

Replacement vs new installation

Renovation conditions may require different routing, materials, or phasing than new-build.

When to Talk Early

When a Quick Discussion Saves Time Later

Some projects benefit from a short review before detailed planning, especially when site conditions or product choices affect technical execution.

  • Dimensions are tight and routing options are limited
  • Products differ from standard assumptions used in initial planning
  • Multiple trades must coordinate in the same technical spaces
  • Renovation conditions are uncertain or partially documented
  • Finishing choices may affect where and how sanitary fixtures are installed
Discuss your project scope
Clear Technical Scope
Practical Execution
Study to Installation
CE-compliant equipment
PEB/EPB project compliance
VCA
RESCERT
KNX Partner
Why Cyeco

Execution You Can Rely On

Sanitary works depend on layout, routing, and coordination with other trades. We focus on defined scope, realistic planning, and clean handover.

  • Scope defined before work begins
  • Fixture and routing decisions documented early
  • Planning aligned with other trades on site
  • Testing, commissioning, and as-built records included
Contact Us
Next Steps

How to Move Forward

Whether you need a preliminary review or are ready to define scope, here is how to proceed:

Share your project brief

Send us plans, fixture preferences, and any known constraints.

Contact us

Get a scope review

We review layout, routing, and coordination points before quoting.

Request a review

Explore related services

Sanitary works often coordinate with HVAC and electrical installations.

View HVAC services

Ready to Discuss Your Sanitary Project?

Contact us to review your project scope, fixture choices, and site constraints — so execution starts with a clear plan.

Request a Quote